Case study / Qatar Grand Prix · 2024 & 2025

From concert control
to wider event delivery.

Two successive appointments, connecting operational readiness, teams and live decisions across the Qatar Grand Prix entertainment programme.

Dave Sammons at the Qatar Formula 1 circuit in 2024

Photograph: Qatar Grand Prix, 2024. The appointments below distinguish my roles in each year.

2024Tactical Lead, concerts
Running the event control function
2025Deputy Director of the Fanzone
Tactical Lead, concert series
ContributionReadiness · Control · Team coordination

A broader remit
in 2025.

In 2024, I was Tactical Lead for the concerts and ran the event control function. In 2025, my appointment expanded to Deputy Director of the Fanzone alongside Tactical Lead for the concert series.

My 2025 work began with oversight of the fanzone build from an operational-readiness perspective. As delivery developed, my contribution extended into strengthening operational control, decision logging, crowd-management integration, ingress and egress planning, and live concert delivery.

That required a wider view of how the event would work: the written arrangements, the teams delivering them and the decisions needed as conditions changed.

The practical contribution.

Readiness into delivery

Connected fanzone-build oversight with the practical requirements for a live operation, including crowd interfaces, arrivals and departures.

Control and decisions

Supported the development of control-room plans and procedures, clearer decision pathways and contemporaneous decision logging.

People working together

Facilitated communication between departments and provided advisory support and mentoring to emerging operational staff.

Bring the interfaces
into the open.

The work crossed event delivery, safety, security, crowd management and concert operations. Those functions needed both clear individual responsibilities and a shared understanding of the wider operation.

A central part of my contribution was opening direct conversations, clarifying how responsibilities connected and helping people work through practical issues together.

The concert team provided a strong example of collaborative delivery: people supporting each other, resolving problems and keeping the shared objective in view.

What changed
in practice.

As control-room plans and procedures solidified, decision pathways became clearer, communication improved and the operation settled. Both the fanzone and concerts were delivered.

That is the value I bring to a complex production: reading the arrangements, recognising where the interfaces need attention and helping the people involved make them work on the ground.

I also identified improvements for future operations. This work was delivered as part of the wider event team.

Explore command & tactical leadership →← Back to selected work

Work with Dave

Make the plan work in practice.

Tell me about your project, the decisions ahead and the support you need.

Discuss your project →